GS Documents

Source by Sinta Kemenristek

Total : 597

PENGARUH DELAY TIME PADA POLA PELEDAKAN TERHADAP BESARAN BACKBREAK HASIL PELEDAKAN DI PT. PACIFIC GRANITAMA, KABUPATEN KARIMUN, KEPULAUAN RIAU
Sriwijaya University, 2020
AP MANALU, M Mukiat, B Bochori
Citation : 0
Year : 2020
ANALISIS PENGARUH KEMIRINGAN (GRADE) JALAN TERHADAP KONSUMSI BAHAN BAKAR DAN PRODUKTIVITAS ALAT ANGKUT TEREX TR50 PADA KEGIATAN PENGUPASAN OVERBURDEN DI PIT SERELO 2 PT TRITAMA …
Sriwijaya University, 2020
A KURNIAWAN, A Rahman, B Bochori
Citation : 0
Year : 2020
ANALISIS KINERJA MOTOR GRADER CATERPILLAR 14M3 (STUDI KASUS PADA JALAN PROUKSI COAL GETTING PIT 2 SHOVEL DAN TRUCK BANKO BARAT PT. BUKIT ASAM, TBK. TANJUNG ENIM, SUMATERA SELATAN)
Sriwijaya University, 2020
S PANGESTU, M Hasjim, B Bochori
Citation : 0
Year : 2020
PERENCANAAN DESAIN MAIN SUMP PIT LSA BALANGAN COAL PT LASKAR SEMESTA ALAM KABUPATEN BALANGAN KALIMANTAN SELATAN
Sriwijaya University, 2020
F FAQIH AL HAQUE, A A Taufik, B Bochori
Citation : 0
Year : 2020
REDESAIN SEQUENCE PENAMBANGAN LIMESTONE DENGAN PARAMETER KUALITAS RCO3 79% DI BATURAJA 2 PT SEMEN BATURAJA (PERSERO) TBK SUMATERA SELATAN
Sriwijaya University, 2020
N NURFITRIANI, H Rr Harminuke Eko, B Bochori
Citation : 0
Year : 2020
PERENCANAAN DESAIN PIT PENAMBANGAN BATU KAPUR TAHUN 2020 DENGAN TARGET PRODUKSI 2.300. 000 TON DI TAMBANG BATURAJA I PT SEMEN BATURAJA (PERSERO) TBK
Sriwijaya University, 2020
LF SARI, M Hasjim, B Bochori
Citation : 0
Year : 2020
STUDI BIAYA PENGUPASAN OVERBURDEN PER BCM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANKO BARAT PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN
Sriwijaya University, 2020
MI RAMADHAN, A Rahman, B Bochori
Citation : 0
Year : 2020
PERENCAAN SISTEM PENGANGKUTAN DENGAN MENGGUNAKAN ALAT GALI EXCAVATOR DOOSAN DAN ALAT ANGKUT DUMP TRUCK DAEWOO UNTUK MEMENUHI TARGET PRODUKSI BATUBARA YANG DIINGINKAN DI PT …
Universitas Sriwijaya, 2019
O LIANDY, MH Hasjim, B Bochori
Citation : 0
Year : 2019
STUDI SEQUENCE PENAMBANGAN PT MEARES SOPUTAN MINING DALAM MENCAPAI PRODUKSI 347.850 TON BIJIH TERTAMBANG PADA SEMESTER 2 DI PIT TOKA, TOKATINDUNG GOLD MINE PROJECT, LIKUPANG …
Sriwijaya University, 2018
UR PULUKADANG, S Komar, B Bochori
Citation : 0
Year : 2018
ANALISIS PENGATURAN WAKTU TUNDA OPTIMUM ANTAR LUBANG LEDAK MENGGUNAKAN METODE SIGNATURE HOLE UNTUK MENDAPATKAN NILAI PPV≤ 3 MM/S DI PIT PINANG SOUTH PT. KALTIM PRIMA COAL …
Sriwijaya University, 2017
G KURNIAWAN, B Bochori
Citation : 0
Year : 2017