GS Documents

Source by Sinta Kemenristek

Total : 597

ANALISIS TINGKAT GETARAN TANAH (GROUND VIBRATION LEVEL) AKIBAT PELEDAKAN OVERBURDEN UNTUK MENCAPAI KONDISI AMAN TERHADAP KAWASAN PEMUKIMAN PENDUDUK DI PT. KUANSING INTI MAKMUR …
Sriwijaya University
A FAREZA, D Sudarmono, D Purbasari
Citation : 0
Year : 2018
PENGARUH PERSENTASI LUMPUR TERHADAP EFEKTIFITAS DAN PUMP FUEL CONSUMPTION POMPA MULTIFLO MF420EX SUMP PIT 1 ABN PROJECT DI PT PETROSEA, TBK KAMPUNG JAWA KEC. SANGA-SANGA KAB …
Sriwijaya University
ET GULTOM, S Komar, UA Prabu
Citation : 0
Year : 2016
EVALUASI KINERJA ALAT GALI MUAT DAN ANGKUT PADA PENGUPASAN OVERBURDEN DI PIT SERELO 2 PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN
Sriwijaya University, 2019
ARIO WIJAYA, M Mukiat, D Purbasari
Citation : 0
Year : 2019
KAJIAN TEKNIS PRODUKTIVITAS HAMMER CRUSHER TUBAN 1 UNTUK MENCAPAI TARGET PRODUKSI BATU KAPUR SEBESAR 425.250 TON/BULAN DI PT SEMEN INDONESIA (PERSERO) TBK KABUPATEN TUBAN
Sriwijaya University
A FAHRUDIN, M Mukiat, FR Suwardi
Citation : 0
Year : 2018
ANALISIS PENGARUH PERUBAHAN NILAI TOTAL MOISTURE DAN ASH CONTENT TERHADAP NILAI KALORI BATUBARA JENIS AL-55 DI TANJUNG ENIM DAN DI UNIT DERMAGA KERTAPATI PALEMBANG
Sriwijaya University, 2017
MF BAROKAH, M Mukiat, RR Ningsih
Citation : 0
Year : 2017
EVALUASI KEHILANGAN WAKTU KERJA PRODUKTIF ALAT GALI MUAT DAN ALAT ANGKUT DALAM UPAYA MENINGKATKAN PRODUKSI BATUBARA DI PENAMBANGAN AIR LAYA SELATAN PT. BUKIT ASAM (PERSERO), Tbk.
Sriwijaya University
MB KUNCORO, M Mukiat
Citation : 0
Year : 2017
EVALUASI SISTEM PENIRISAN TAMBANG DI PIT 1 BARAT BANGKO BARAT PT. BUKIT ASAM (PERSERO), TBK UNIT PENAMBANGAN TANJUNG ENIM, SUMATERA SELATAN
Sriwijaya University, 2016
A KURNIAWAN, M Asof, M Mukiat
Citation : 0
Year : 2016
PERENCANAAN KEBUTUHAN ALAT GALI MUAT DAN ANGKUT UNTUK MEMENUHI TARGET PRODUKSI LIMESTONE 1.000. 000 TON/TAHUN DI PIT 4142 PT. SEMEN INDONESIA (PERSERO) TBK SITE TUBAN, PROVINSI …
Sriwijaya University
M MURSID, MT Toha, D Purbasari
Citation : 0
Year : 2018
EVALUASI KINERJA BULLDOZER RIPPER DAN EXCAVATOR BACKHOE UNTUK MEMENUHI TARGET PRODUKSI PADA PENGUPASAN OVERBURDEN DI PT. ULIMA NITRA JOB SITE PT. MME, TANJUNG ENIM
Sriwijaya University, 2017
H KURNIAWAN, S Komar, D Purbasari
Citation : 0
Year : 2017
EVALUASI KESESUAIAN DESAIN PIT BULAN OKTOBER TERHADAP KEADAAN LAPANGAN DI PIT 1 TIMUR BANKO BARAT PT BUKIT ASAM TBK
mining engineering, 2019
R FIRNANDHO, E Ibrahim, D Purbasari
Citation : 0
Year : 2019