EVALUASI METODE RIPPING TERHADAP FRAGMENTASI BATUBARA DI UNIT PENAMBANGAN DENGAN MENGGUNAKAN SHOVEL & TRUK PADA PIT 2 TAMBANG BANKO BARAT PT. BUKIT ASAM, Tbk. TANJUNG ENIMÂ …
Sriwijaya University
ALEO PERMANA, M Mukiat, D Purbasari
Citation : 0
Year : 2020 |
PENGARUH LEAKAGE FACTOR DAN BALANCING FACTOR TERHADAP DESAIN KRITERIA KUANTITAS ALIRAN UDARA TAMBANG BAWAH TANAH DMLZ PT FREEPORT INDONESIA DISTRIK TEMBAGAPURA, KABUPATENÂ …
Sriwijaya University
F RAHMAT, RHE Handayani, D Purbasari
Citation : 0
Year : 2020 |
ANALISIS DAN STABILISASI LERENG TIMBUNAN TANAH PENUTUP DI PT. BUMI MERAPI ENERGI
Applicable Innovation of Engineering and Science Research (AVoER), 330-334, 2020
H Waristian, D Purbasari, A Alhadi
Citation : 0
Year : 2020 |
EVALUASI KEMAMPUAN PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT DI PIT 3 TIMUR BANKO BARAT PT. BUKIT ASAM TBK. TANJUNG ENIM SUMATERA SELATAN
Sriwijaya University, 2020
E SYUKRIYATI, M Mukiat, D Purbasari
Citation : 0
Year : 2020 |
ANALISIS PRODUKSI RECLAIM FEEDER UNTUK MEMENUHI TARGET PRODUKTIVITAS 420.000 TON PER BULAN DI COAL HANDLING FACILITY MUARA TIGA BESAR UTARA, PT BUKIT ASAM, TBK. TANJUNG ENIMÂ …
Sriwijaya University
PE SARI, M Mukiat, D Purbasari
Citation : 0
Year : 2020 |
EVALUASI METODE RIPPING TERHADAP FRAGMENTASI BATUBARA DI UNIT PENAMBANGAN DENGAN MENGGUNAKAN SHOVEL & TRUK PADA PIT 2 TAMBANG BANKO BARAT PT. BUKIT ASAM, Tbk. TANJUNG ENIMÂ …
Sriwijaya University, 2020
ALEO PERMANA, M Mukiat, D Purbasari
Citation : 0
Year : 2020 |
PENGARUH JARAK ANGKUT DAN GEOMETRI JALAN TERHADAP SISTEM PENERAPAN 2 JALUR ANGKUT BERDASARKAN PRODUKTIVITAS DAN KONSUMSI FUEL ALAT ANGKUT DUMP TRUCK CAT 773E DI PT. JRESOURCESÂ …
Sriwijaya University, 2020
IR TUNLIU, MT Toha, D Purbasari
Citation : 0
Year : 2020 |
EVALUASI METODE RIPPING TERHADAP FRAGMENTASI BATUBARA GUNA MENINGKATKAN EFFESIENSI EXCAVATOR BACKHOE (BREAKER) DI PIT MUARA TIGA BESAR UTARA PT. BUKIT ASAM, Tbk. TANJUNG ENIMÂ …
Sriwijaya University, 2020
ARIH GENESA, MT Toha, D Purbasari
Citation : 0
Year : 2020 |
ANALISIS PRODUKSI RECLAIM FEEDER UNTUK MEMENUHI TARGET PRODUKTIVITAS 420.000 TON PER BULAN DI COAL HANDLING FACILITY MUARA TIGA BESAR UTARA, PT BUKIT ASAM, TBK. TANJUNG ENIMÂ …
Sriwijaya University, 2020
PE SARI, M Mukiat, D Purbasari
Citation : 0
Year : 2020 |
EVALUASI PRODUKTIVITAS ALAT GALI MUAT DAN ANGKUT TERHADAP KETIDAKTERCAPAIAN PRODUKSI BATUBARA DI PIT 2A KABUPATEN LAHAT, SUMATERA SELATAN
Jurnal Pertambangan 3 (1), 10-16, 2019
A Rahman, D Purbasari
Citation : 0
Year : 2019 |