GS Documents

Source by Sinta Kemenristek

Total : 204

ANALISIS PERBANDINGAN BIAYA PENGANGKUTAN OVERBURDEN MENGGUNAKAN DUMP TRUCK ISUZU 20 TON DAN DUMP TRUCK CAT ADT 35 TON DI PT. BATURONA ADIMULYA MUSI BANYUASIN SUMATERA SELATAN
Sriwijaya University, 2018
I RAMADHAN, MT Toha, B Bochori
Citation : 0
Year : 2018
EVALUASI KINERJA OPERASI PENGEBORAN DAN PELEDAKAN TERHADAP PRODUKTIVITAS EXCAVATOR DI QUARRY KARANG PUTIH PT. SEMEN PADANG, INDARUNG.
Sriwijaya University, 2018
R Meidiantoni, MT Toha, D Purbasari
Citation : 5
Year : 2018
PERENCANAAN KEBUTUHAN ALAT GALI MUAT DAN ANGKUT UNTUK MEMENUHI TARGET PRODUKSI LIMESTONE 1.000. 000 TON/TAHUN DI PIT 4142 PT. SEMEN INDONESIA (PERSERO) TBK SITE TUBAN, PROVINSI …
Sriwijaya University, 2018
M MURSID, MT Toha, D Purbasari
Citation : 0
Year : 2018
PERENCANAAN SISTEM PENYALIRAN PADA AREA STOCKPILE BATUBARA PT. MUARA ALAM SEJAHTERA DI TANJUNG BARU, PALEMBANG, SUMATERA SELATAN
Sriwijaya University, 2018
F AGINDRA, MT Toha, MA Abro
Citation : 0
Year : 2018
Analisis Peledakan Overburden Dengan Metode Top Air Deck Terhadap Hasil Fragmentasi Dan Digging Time Di Pit Pinang South Panel 3pt. Kaltim Prima Coal, Sangatta, Kalimantan Timur
Jurnal Pertambangan 2 (2), 20-28, 2018
D Pradatama, MT Toha
Citation : 2
Year : 2018
EVALUASI METODE RIPPING TERHADAP FRAGMANTASI BATUBARA UNTUK MENINGKATKAN KINERJA RIPPER BULLDOZER KOMATSU D 375 A DAN EXCAVATOR BACKHOE KOMATSU PC 400 LC DI PIT MUARA TIGA …
Sriwijaya University, 2018
A SUYUDI, MT Toha, FR Suwardi
Citation : 0
Year : 2018
ANALISIS PELEDAKAN OVERBURDEN DENGAN METODE TOP AIR DECK TERHADAP FRAGMENTASI DAN DIGGING TIME EXCAVATOR PADA PIT PINANG SOUTH PANEL 3 PT. KALTIM PRIMA COAL, SANGATTA …
Sriwijaya University, 2018
D PRADATAMA, MT Toha
Citation : 0
Year : 2018
ANALISIS FRAGMENTASI PELEDAKAN TERHADAP PRODUKTIVITAS ALAT GALI MUAT BIJIH EMAS PADA TAMBANG TERBUKA DI PT J RESOURCES BOLAANG MONGONDOW PROVINSI SULAWESI UTARA
Sriwijaya University, 2018
AE SARI, MT Toha, FR Suwardi
Citation : 0
Year : 2018
ANALISIS PENGARUH FRAGMENTASI PELEDAKAN OVERBURDEN TERHADAP PRODUKTIVITAS EXCAVATOR PC 1250-8 PADA TAMBANG BATUBARA PT MUARA ALAM SEJAHTERA KABUPATEN LAHAT SUMATERA SELATAN
Sriwijaya University, 2018
YJ AMIN, MT Toha
Citation : 0
Year : 2018
ANALISIS METODE RIPPING OVERBURDEN DENGAN BULLDOZER RIPPER D 375 A-5 SEBAGAI ALAT BANTU EXCAVATOR PC 2000 PADA PENAMBANGAN BATUBARA PIT TAL BARAT PT. PAMAPERSADA NUSANTARA …
Sriwijaya University, 2018
W JUWITA, MT Toha, S Syarifudin
Citation : 0
Year : 2018