ANALISIS PERUBAHAN NILAI PARAMETER KANDUNGAN AIR TOTAL, KADAR ABU, DAN NILAI KALORI TERHADAP KUALITAS BATUBARA DARI STOCKPILE SUKACINTA KE STOCKPILE KERTAPATI DI PT. MUARA ALAMÂ …
Sriwijaya University, 2018
LA MORA, M Mukiat, B Bochori
Citation : 0
Year : 2018 |
STUDI SEQUENCE PENAMBANGAN PT MEARES SOPUTAN MINING DALAM MENCAPAI PRODUKSI 347.850 TON BIJIH TERTAMBANG PADA SEMESTER 2 DI PIT TOKA, TOKATINDUNG GOLD MINE PROJECT, LIKUPANGÂ …
Sriwijaya University, 2018
UR PULUKADANG, S Komar, B Bochori
Citation : 0
Year : 2018 |
Blasting Design Without Subdrilling on Jointed Limestone to Optimize Fragmentation and Blasting Cost
International Journal on Advanced Science, Engineering and Information …, 2017
MT Toha, Bochori, Waluyo
Citation : 0
Year : 2017 |
Mitigation of landslide area around railway tunnel, South Sumatra Province, Indonesia
AIP Conference Proceedings, https://doi.org/10.1063/1.5005935 1885 (1), 020306, 2017
MT Toha, D Setiabudidaya, S Komar, Bochori, MA Ghadafi, M Adiwarman, ...
Citation : 2
Year : 2017 |
ANALISIS PENGATURAN WAKTU TUNDA OPTIMUM ANTAR LUBANG LEDAK MENGGUNAKAN METODE SIGNATURE HOLE UNTUK MENDAPATKAN NILAI PPV≤ 3 MM/S DI PIT PINANG SOUTH PT. KALTIM PRIMA COALÂ …
Sriwijaya University, 2017
G KURNIAWAN, B Bochori
Citation : 0
Year : 2017 |
Penerapan Block Modelling Dalam Perencanaan Tingkat Produksi Batubara Di Pit Kuskus Departemen Hatari PT. Kaltim Prima Coal Provinsi Kalimantan Timur
Jurnal Pertambangan 1 (1), 2016
M Ichsan
Citation : 1
Year : 2016 |
Rancangan Lokasi Disposal Untuk Rencana Penambangan Pit Inul East Selama Bulan Juli 2013 Sampai Desember 2014 Di Departemen Hatari PT Kaltim Prima C...
Jurnal Ilmu Teknik 2 (4)
Y Prayoga, MT Toha, Bochori
Citation : 0
Year : 2014 |
Analisa Laju Produksi Kritis Menggunakan Metode Chierici Dalam Evaluasi Terjadinya Water Coning Pada Sumur X Lapangan Y PT Pertamina Ep Asset 1field Ram...
Jurnal Ilmu Teknik 2 (2)
F Jenita, S Komar, B Bochori
Citation : 0
Year : 2014 |
Rancangan Lokasi Disposal Untuk Rencana Penambangan Pit Inul East Selama Bulan Juli 2013 Sampai Desember 2014 Di Departemen Hatari PT Kaltim Prima Coal
Jurnal Ilmu Teknik 2 (4), 2014
Y Prayoga, MT Toha, Bochori
Citation : 0
Year : 2014 |
Analisa Laju Produksi Kritis Menggunakan Metode Chierici Dalam Evaluasi Terjadinya Water Coning Pada Sumur X Lapangan Y PT Pertamina Ep Asset 1field Ramba
Jurnal Ilmu Teknik Sriwijaya 2 (2), 101415, 2014
F Jenita, S Komar, B Bochori
Citation : 0
Year : 2014 |