photo
photo

EDDY IBRAHIM

Ilmu Lingkungan

NIDN/NIDK : 0022116203

Profesor

EDDY IBRAHIM

Ilmu Lingkungan

NIDN/NIDK : 0022116203

Profesor

H-INDEX

WoS H-Index : 0

Scopus H-Index : 5

Google H-Index : 8

H-INDEX

WoS H-Index : 0

Scopus H-Index : 5

Google H-Index : 8

GS Documents

Source by Sinta Kemenristek

Total : 245

Study of Physical Properties of Rocks and Acid Mine Drainage Potential at Banko Barat Tanjung Enim
The 5th Sriwijaya International Seminar on Energy and Environmental Science …, 2014
S Siti, E Ibrahim, S Dedi, F M
Citation : 0
Year : 2014
Kajian Teknis Produktivitas Alat Gali-Muat (Excavator) dan Alat Angkut (Dump Truck) pada Pengupasan Tanah Penutup Bulan September 2013 di Pit 3 Banko Barat PT. Bukit Asam …
Jurnal Ilmu Teknik 2 (3)
RR Ilahi, E Ibrahim, FR Swardi
Citation : 53
Year : 2014
Studi Korelasi Ukuran Butir Semikokas dan Komposisi Briket Terhadap Asap dan Bau Hasil Pembakaran Briket Batubara
Seminar Nasional Teknologi Industri Hijau 1, Litbangyasa Untuk Mendukung …, 2014
E Ibrahim, TA Hendra
Citation : 0
Year : 2014
Kajian Implementasi Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) terhadap Keselamatan dan Kesehatan Pekerja Di PT. Bukit Asam (Persero) Tbk
Jurnal Ilmu Kesehatan Masyarakat 5 (3), 2014
R Noprianty, E Ibrahim, R Juniah
Citation : 3
Year : 2014
Kajian teknis produktivitas alat gali-muat (excavator) dan alat angkut (dump truck) pada pengupasan tanah penutup bulan September 2013 di pit 3 Banko Barat PT. Bukit Asam …
Jurnal Ilmu Teknik 2 (3), 2014
RR Ilahi, E Ibrahim, FR Swardi
Citation : 74
Year : 2014
Characteristic of Coal Stockpile in Lowland and the Effect to Environment
Recent Trends in Physics of Material Science and Technology, 221-243, 2014
Rusdianasari, S Arita, E Ibrahim, Ngudiantoro
Citation : 11
Year : 2014
Perancangan Plant Pengolahan Air Asam Tambang Dengan Proses Sand Filtrasi, Ultrafiltrasi dan Reverse Osmosis
Prosiding SNaPP: Sains, Teknologi 4 (1), 193-200, 2014
S Nasir, E Ibrahim, AT Arief
Citation : 5
Year : 2014
Reduction of metal contents in coal stockpile wastewater using electrocoagulation
Applied Mechanics and Materials 391, 29-33, 2013
R Bow, S Arita, E Ibrahim, N Ngudiantoro
Citation : 19
Year : 2013
Studi struktur perlapisan batubara menggunakan analisa distribusi energi waktu-frekuensi terhadap data GPR
TPT XXII PERHAPI 2013, Oktober 2013, Hotel Sheraton, Jogyakarta, 2013
E Ibrahim, T Toha
Citation : 0
Year : 2013
Perancangan Plant Pengolahan Air Asam Tambang dengan Metode Kombinasi Sand Filter, Ultrafiltrasi, dan Reverse Osmosis

S Nasir, AT Arief, E Ibrahim
Citation : 0
Year : 2013