Evaluasi Metode Ripping untuk Mengoptimalkan Fragmentasi Batubara Guna Meningkatkan Kinerja Excavator Di Pit Muara Tiga Besar Utara Pt Pamapersada Nusantara Jobsite Tanjung …
Jurnal Pertambangan 2 (4), 62-71, 2018
A Suyudi, MT Toha, FR Suwardi
Citation : 2
Year : 2018 |
Analisis resiko dan bahaya pada area penambangan batubara di pt tambang bukit tambi, site padang kelapo, kab
Batanghari. Prov. Jambi. Sriwijaya University, 2022
A Nusanta, MT Toha, A Suherman
Citation : 2
Year : 2022 |
Kajian Ulang Desain Separator Untuk Mencapai Target Produksi 1500 Bfpd Pada Oil Plant SG-09 PT. Energi Mega Persada (EMP) Gelam – Jambi
The Jurnal Pertambangan 1 (2), 2017
DDA Sukaryo, MT Toha, UA Prabu
Citation : 1
Year : 2017 |
Strategy for technology energy selection to achieve coal value added in PT. Bukit Asam (Persero), Tbk.
IJFAC (Indonesian Journal of Fundamental and Applied Chemistry) 2 (3), 66-77, 2017
P Rostiarti, E Ibrahim, T Toha
Citation : 1
Year : 2017 |
Analysis of the Blasting Effect on the Environment around Blasting Areas at Pt. Semen Baturaja Persero, Tbk.
Indonesian Journal of Environmental Management and Sustainability 1 (1), 15-18, 2017
JF Lubis, T Toha, N Ngudiantoro
Citation : 1
Year : 2017 |
ANALISIS METODE RIPPING UNTUK MENGOPTIMALKAN FRAGMENTASI BATUBARA DALAM RANGKA MENINGKATKAN PRODUKTIVITAS EXCAVATOR BACKHOE DI TAMBANG BANKO BARAT PT BUKIT ASAM (PERSERO), TBK
Jurnal Pertambangan 2 (3), 1-10, 2018
R Sebastian, T Toha
Citation : 1
Year : 2018 |
DESAIN PIT PENAMBANGAN LIMESTONE DENGAN TARGET PRODUKSI 1.248. 000 TON PADA IUP OPERASI PRODUKSI BATURAJA 2 DI PT. SEMEN BATURAJA (PERSERO) TBK, SUMATERA SELATAN
Sriwijaya University, 2019
WJ Kelana, M Taufik Toha, D Sudarmono
Citation : 1
Year : 2019 |
GEOMETRI PELEDAKAN BERDASARKAN ROCK MASS RATING (RMR) DAN FRAGMENTASI HASIL PELEDAKAN
Jurnal Pertambangan 4 (4), 209-215, 2020
MT Toha, BK Susilo
Citation : 1
Year : 2020 |
Evaluasi Termal Vertical Greenery System Tipe Green Facade pada Dinding Bangunan Thermal Evaluation of Vertical Greenery System Type Façade on Building Wall
Jurnal Teknik Pertanian Lampung Vol 10 (3), 296-302, 2021
M Haviz, MT Toha, R Sipahutar, O Alfernando
Citation : 1
Year : 2021 |
Bochori. 2017. Desain Teknis Pit Penambangan Batubara Dengan Target Produksi 630.000 Ton Per Tahun Di Pit 5 PT. Golden Great Borneo Kabupaten Lahat, Sumatera Selatan
Dalam Jurnal Pertambangan 1 (4), 38-47, 0
EA Indrawan, MT Toha
Citation : 1
Year : 0 |