ANALISIS KESTABILAN LERENG TAMBANG TERBUKA BATUBARA PADA BATUAN LEMAH PIT A MUSI BANYUASIN SUMATERA SELATAN
Sriwijaya University, 2020
KAADI CAHYA, M Asof, M Amin
Citation : 0
Year : 2020 |
ANALISIS EKSTRAKSI DAN KARAKTERISTIK MINERAL SILIKA DARI LIMBAH PADAT FLY ASH DAN BOTTOM ASH HASIL PEMBAKARAN BATUBARA MENGGUNAKAN METODE ASAM DENGAN LARUTAN NaOH DAN H2SO4
Sriwijaya University, 2020
R RAHMAWATI, M Asof, M Mukiat
Citation : 0
Year : 2020 |
Kajian Aplikasi Bottom Air Deck Pada Peledakan Overburden Di Pt Bukit Asam, Tbk
Jurnal Pertambangan 3 (2), 16-24, 2019
R Hidayat, M Asof
Citation : 1
Year : 2019 |
DAMPAK PELEDAKAN OVERBURDEN TERHADAP KESELAMATAN KERJA DI PIT 2 BANKO BARAT PT. BUKIT ASAM, TBK TANJUNG ENIM, SUMATERA SELATAN
Sriwijaya University, 2019
W APRIANI, M Asof, M Mukiat
Citation : 0
Year : 2019 |
ANALISIS PENGARUH PELEDAKAN OVERBURDEN MENGGUNAKAN AIR DECK DENGAN NON AIR DECK TERHADAP GROUND VIBRATION DI PIT 2 BANGKO BARAT PT. BUKIT ASAM, TBK. TANJUNG ENIM, SUMATERA SELATAN
Sriwijaya university, 2019
EGA SITUMORANG, M Asof, M Mukiat
Citation : 0
Year : 2019 |
Implementasi Pemanfaatan Kotoran Sapi Sebagai Sumber Energi Alternatif Pada Peternakan Sapi
Prosiding Applicable Innovation of Engineering and Science Research, 1280-1282, 2019
R Pebrianto, M Asof, H Waristian
Citation : 1
Year : 2019 |
Characteristics Analysis Of Char Resulted From Low Rank Coal Gasification
International Journal on Advanced Science, Engineering and Information …, 2019
M Asof, S Arita, R Febrianto, M Mukiat, DP Suryani, DP DEWANTARA
Citation : 0
Year : 2019 |
ANALISIS PEMAKAIAN BAHAN BAKAR BULLDOZER D155A-6 BERDASARKAN WAKTU KERJA EFEKTIF DI DISPOSAL CHELSEA MUARA TIGA BESAR UTARA PT. BUKIT ASAM Tbk, TANJUNG ENIM SUMATRA SELATAN
Sriwijaya University, 2019
M TANJUNG, M Asof, M Mukiat
Citation : 0
Year : 2019 |
DAMPAK PELEDAKAN OVERBURDEN TERHADAP KESELAMATAN KERJA DI PT. BUKIT ASAM, TBK
DAMPAK PELEDAKAN OVERBURDEN TERHADAP KESELAMATAN KERJA DI PT. BUKIT ASAM, TBK, 2019
W APRIANI, M Asof, M Mukiat
Citation : 0
Year : 2019 |
PERENCANAAN SISTEM PENYALIRAN TAMBANG BATUBARA DIPIT SERELO UTARA PT BUMI MERAPI ENERGI KABUPATEN LAHAT
Jurnal Pertambangan 2 (4), 34-43, 2018
DSNC Mayor, M Asof
Citation : 4
Year : 2018 |